With a machine equipped with Unit-shift, Unit-Adding, the MNK-attachment also.... also the codes for repeat signalls...
these give a lot of connections, and when the air pressure is too high, the air might leak into some strange pipes...
This was not with a computer interface controlled machine, after cleaning a press with high air pressure, the air pressure was not lowered and connected with the caster again...